Building 1997
Layout
Holes for Pads
6 Pads
6 x 6 Beams
Bolted to Pads
Vapor Barrier
Deck Foundation
Flooring
Walls
Walls
Dome Base Mounting Ring
Top View with Mounting Ring
Mounting Profile
Walls Plywood
Top (did not last long)
Top Profile
Top
Mounting Ring Supports
More of Top and Mounting Ring
Time to Install the Dome (Walter)
William in the Lift
Now its my turn (Walter)
Ready for Lift (Walter)
Still Ready (Walter)
Here it Comes (Where is Everyone?)
Another Lift View
Easy does it (Mike helping, Walter in Lift)
Touch Down (Walter in Lift, Jerry going in)
View from the Lift
View from the Lift
Ready for Siding
Siding
Ready to Use
Observatory
Observatory
Observatory
Observatory
Inside Ready for Paint
Wiring
Power and Data Trench
Power and Data Trench
Dome Base Mounting Ring
Walls Done
Observatory Open
Trench Filled
View from House
Digging Pier
Hit Water
Digging Pier
Hole Done
Ready to Concrete
My Mixer
Pouring 1/2 way done
Luke pouring
My helpers
PierTech J bolts
PierTech Bottom
Ready for the PierTech
PierTech Installed
Generated by
jAlbum 23.2.4
,
Jupiter 29